皇冠博彩app
热门标签

欧博代理开户:Fukushima debris removal delayed by another year

时间:1个月前   阅读:8

Hga030www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。Hga030上登录线路最新、新2皇冠网址更新最快,Hga030开放皇冠会员注册、皇冠代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博代理开户www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:澳幸运5开户:Bursa rises cautiously ahead of Jackson Hole meet

下一篇:足球博彩app:Aaron-Wooi Yik storm into World Championships final

网友评论